New Storm-Water Drain Covers Installed
All broken drain covers on the internal lanes have been replaced with heavier pre-cast covers ahead of the monsoon.
On the ground
What's being worked on right now, what's planned next, and how the society's projects — including redevelopment — are moving along.
The roadmap
Completed 3/17/2026
Full repair and repainting of the society boundary wall, completed before the monsoon.
Target 10/28/2026
Jogging track resurfacing, new benches, and drip irrigation for the lawns.
Target 11/17/2026
Resurfacing of the two oldest internal lanes, including storm-water drain covers.
Target 12/2/2026
Structural and financial feasibility study by the appointed consultant, to be presented at the AGM.
Target 3/2/2027
Kitchen and stage extension of the community hall, as per the approved drawing.
Target 4/1/2027
Presentation of the feasibility report and a General Body vote on whether to proceed.
Field notes
All broken drain covers on the internal lanes have been replaced with heavier pre-cast covers ahead of the monsoon.
Repainting of the Shri Ganesh Mandir has begun and will finish well before Ganesh Chaturthi. Morning and evening aarti continue as usual.
The consultant's team has completed structural surveys of bungalows on Lanes 1 through 4. Lanes 5 and 6 are scheduled for next week. Residents will be notified a day in advance.
The 400 m jogging track around the central lawn has been resurfaced with a softer synthetic finish. Morning walkers can use it from tomorrow; the east lawn stays fenced until the new grass takes root.